Sample Report

See exactly what your report looks like.

This preview shows how ZunoQuote breaks down every line item, surfaces pricing risk, and gives you the exact questions to negotiate confidently. The full report is unlocked per quote.

ZunoQuote · Forensic Analysis

HVAC Replacement Quote

ABC Air & Plumbing LLC · Tampa, FL 33602

February 28, 2026 · 3-Ton Central AC System

Sample

Quote Total

$0

Market Band

$4.4k–$4.8k

Possible Overcharge

$1,000+

Inflated Items

0 found

Verdict: Likely overpriced

This quote exceeds the expected local market range by $1,000 or more.

High Risk

Line-by-Line Breakdown

Fair rangeQuoted

3-Ton Carrier AC Unit (24ACC336A003)

Inflated
Quoted $2,800Fair $1.7k–$2.1k+33%

Equipment pricing exceeds the expected benchmark range for this unit type and tonnage, which suggests a significant markup.

Labor - Installation (est. 8 hrs)

Fair
Quoted $960Fair $700–$1,0000%

This labor line lands inside the expected local range.

4 more rows locked · includes missing-scope and markup-rate checks

Red Flags, 4 found

  • 1

    Permit-related scope appears to be missing from the estimate.

  • 2

    At least one consumable line item appears significantly above market.

  • 3

    The quote structure makes it harder to separate equipment markup from labor.

  • 4

    Some charges look bundled in a way that limits apples-to-apples comparison.

4 red flags · unlocked in your full report

Questions to Ask (5 tailored)

  1. 1

    Can you separate parts, labor, and permit-related charges?

  2. 2

    What exactly is included in the installed equipment price?

  3. 3

    Will your team pull and close the required permit for this job?

  4. 4

    How are refrigerant and disposal charges calculated?

  5. 5

    Which items are fixed, and which could change after work begins?

5 contractor questions · tailored to your quote

Contractor Reply Draft

Dear ABC Air & Plumbing,

After reviewing your estimate in detail, I have a few questions I'd like addressed before signing off. First, regarding the equipment pricing…

[Continues with 3 more targeted paragraphs tailored to your flags.]

Contractor reply draft · written for your situation
Unlock full analysis

Analyze your own quote.

Upload your HVAC or plumbing estimate. Your full forensic report is ready in minutes.

Full line-item breakdownAll red flagsContractor questionsReply draft

From $29.99 · single report · no subscription · never expires

Secure payment·VisaMastercardAmerican ExpressApple PayPayPal·No subscription

Ready to find out if your real quote is overpriced?

Upload your quote